云南某铜锌铁多金属矿开拓运输方案选择 被引量:1

Development and transportation schemes selection of a Cu-Zn-Fe Polymetallic Mine in Yunnan Province
下载PDF
导出
摘要 根据云南某铜锌铁矿体赋存条件和矿山基建现状,对矿床提出3个开拓运输方案,并进行了详细的技术经济比较分析,最终推荐了新掘主、副竖井(1主2副)+辅助斜坡道(自1630~1420m,不出地表)、利用2^#、4^#、6^#斜井方案。 According to the ore body's occurrence conditions and the mine's infrastructure status of a Cu-Zn-Fe Polymetallic Mine in Yunnan province, the paper proposes three development and transportation schemes for the deposit, and makes a detailed technical and economic comparison analysis. Finally the scheme of "digging new main and auxiliary shafts (one main shaft and two auxiliary ones) + auxiliary ramp (the distance from 1 630 to 1 420 m is not visible on the surface), and using 2^#, 4^#, 6^# inclined shaft is recommended.
出处 《有色金属(矿山部分)》 2015年第B08期125-127,共3页 NONFERROUS METALS(Mining Section)
关键词 铜锌铁多金属矿 运输 开拓 Cu-Zn-Fe Polymetallic Mine transportation development
  • 相关文献

参考文献8

二级参考文献19

  • 1王贤来,陈得信,文友道,崔继强.龙首矿深部开采工程方案的选择[J].采矿技术,2005,5(4):17-19. 被引量:1
  • 2刘晓飞,孟庆森,樊志刚.南芬露天矿矿石开拓运输过渡方案的决策分析[J].矿业快报,2006,22(12):33-35. 被引量:1
  • 3北京有色金属设计研究总院.采矿设计手册(矿床开采卷)[M].北京:中国建筑工业出版社,1989.
  • 4北京有色金属设计研究总院.采矿设计手册(井巷工程卷)[M].北京:中国建筑工业出版社,1989.
  • 5蔡嗣经.矿山充填力学基础[M].北京:冶金工业出版社,2009.
  • 6中国有色工程设计研究总院.白象山铁矿初步设计(第1卷)[R].北京:中国有色工程设计研究总院,2005.
  • 7王青,史维祥.采矿学[M].北京:冶金工业出版社,2005:416-419.
  • 8北京有色冶金设计研究总院.采矿设计手册:矿床开采卷[M].北京:中国建筑工业出版社,1987.
  • 9中钢集团武汉安全环保研究院等.GB 16423—2006 中华人民共和国国家标准金属非金属矿山安全规程[S].北京:中国标准出版社,2006.
  • 10中国有色金属工业协会.GB 50771—2012 中华人民共和国国家标准有色金属采矿设计规范[S] ?北京:中国计划出版社,2012.

共引文献8

同被引文献115

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部