期刊文献+

有限空间半逆作法施工中的综合管线原地保护技术 被引量:1

Integrated Pipeline In-Place Protection Technology During Semi-Reversed Construction in Confined Space
下载PDF
导出
摘要 广州宏城广场综合改造工程二期基坑在有限的空间条件下,需解决施工空间不足、综合管线原地保护等一系列问题。针对上述存在的施工难点,对扩展施工可用场地、综合管线原地保护等问题展开一系列研究,取得了良好的效果,可供类似工程借鉴。 Under finite special condition, the reconstruction project Phase Ⅱ of Guangzhou Hongcheng Plaza foundation pit should solve a series of difficulties, such as lack of construction space and integrated pipeline in-place protection. Therefore, a series of research was carried out to solve the construction difficulties including the construction site extension and the integrated pipeline in-place protection, which have achieved good effect and can provide references for similar projects.
出处 《建筑施工》 2015年第8期919-921,共3页 Building Construction
关键词 半逆作法 有限空间 管线 原地保护 悬挂式吊架 semi-reversed construction method confined space pipeline in-place protectionsuspended hanger
  • 相关文献

参考文献10

二级参考文献27

共引文献172

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部