摘要 霍尔三维模型为工程项目管理提供了一种系统化的思维模式.以我国气象工程中综合气象观测系统运行监控平台(ASOM)开发项目为实例,结合气象工程项目的实际特点,从5个阶段的时间维度、7个步骤的逻辑维度和10个方面的知识维度对我国气象工程项目的霍尔三维模型进行了尝试性研究,结果具有较好适用性.研究结果可作为我国气象工程项目的管理依据,同时可为其他行业基于职能式管理模式的项目管理工作提供参考. The three-dimensional matrix theory of A. D. Hall provided a systematic mode for project management.The Atmospheric observation System Operations and Monitoring( ASOM) project is taken as an example to investigate the three-dimensional matrix structure using the A. D. Hall theory. Taking into account the actual characteristics of meteorological engineering project,we construct the three dimensional matrix of meteorological management project including five time dimensions,seven logic dimensions and ten knowledge dimensions. The examination shows that the result has good applicability. This study could be taken as the basis of meteorological project construction management in China; at the same time,it provides reference for other industries in functional type management mode.
出处 《南京信息工程大学学报(自然科学版)》 CAS 2015年第4期331-337,共7页 Journal of Nanjing University of Information Science & Technology(Natural Science Edition)
基金 中国气象局关键技术集成项目(CM AGJ2013M68)
关键词 霍尔模型 气象工程 项目管理 综合气象观测系统运行监控平台(ASOM) Hall matrix meteorological project project management Atmospheric observation System Operations and Monitoring(ASOM)
  • 相关文献

参考文献24

二级参考文献76

共引文献221

同被引文献60

  • 1廖先玲,孟祥军,何静,陈宁.技术创新绩效及创新模式的案例研究[J].中国管理科学,2008,16(S1):665-669. 被引量:2
  • 2毛静华,刘红丽.基于回溯法的案例推理方法研究[J].情报杂志,2005,24(5):40-41. 被引量:4
  • 3马景娣,缪家鼎.关于查新报告质量评定标准的探讨[J].情报科学,2005,23(11):1681-1684. 被引量:22
  • 4陈劲,陈钰芬.企业技术创新绩效评价指标体系研究[J].科学学与科学技术管理,2006,27(3):86-91. 被引量:301
  • 5教育部科技发展中心.关于规范教育部科技查新工作站查新报告撰写的通知[EB/OL].[2015_02-06].http://www.cutech.edu.cn/cn/zxgz/2013/04/1366997990510136.htm.
  • 6国务院.国务院关于印发促进大数据发展行动纲要的通知[EB/OL].2015-08-311[2015-09-05].http://www.gov.cn/zhengce,content/2015-09/05/content——10137.htm.
  • 7Hall A D. Three-Dimensional Morphology of Systems Engineer- ing[J]. Systems Science and Cybernetics, 1969, 5(2) : 156- 160.
  • 8Crawford P, Bryce P. Project Monitoring and Evaluation: a Method for Enhancing the Efficiency and Effectiveness of Aid Project Implementation[ J]. International Journal of Project Man-agement2003, 21 (5) : 363-373.
  • 9BILBAO-OSORIO B,DUTTA S,LANVIN B. The global information technology report 2014: rewards and risks of big data[EB/OL].(2014-10-10) [2016-06-03].http://www3.weforum.org/docs/WEF_GlobalIn formation Technology_Report 2014.pdf.
  • 10MARZULLO K. Administration issues strategic plan for big data research and development[EB/OL]. (2016-05-23)[2016-05-24].https://www. whitehouse.gov/blog/2016/05/23/administration-issues-strategic-plan- big-data-.

引证文献5

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部