BT模式基础设施项目融资风险分担研究 被引量:2

Research on BT Model of Infrastructure Projecting Risk Sharing
下载PDF
导出
摘要 BT融资模式是从BOT模式转化发展起来的新型投资模式。随着国家对基础设施领域国有资金投入的减少,以及市场竞争机制的不断完善,使得其他资金有更多的机会投向基础设施建设领域,BT融资模式以其强大的融资建设功能在建筑领域发挥着重要的作用。文章在系统总结了风险分担理论的基础上,建立融资风险分担模型,包括建立评价的指标体系,确定模型的评价方法等内容。通过建立风险分担模型从而确定关键风险在各参与者之间的分配。 BT financing model is a new mode of investment developed from BOT model. As state - owned capital investment in infrastructure field is reduces, accompanied with continuous improvement of the market competition mechanism, other funds have more investment channels to infrastructure construction field, with its powerful function of financing the construction, BT financing model plays an important role in the field of architecture. Based on a systematic summary of the risk sharing theory, a financing risk sharing model is established, including evaluation index system, and evaluation method of the model, etc. By establishing risk sharing model, the key risk allocation between each participant can be determined.
作者 许以俪
出处 《煤炭工程》 北大核心 2015年第9期144-146,共3页 Coal Engineering
关键词 BT融资模式 风险分担 评价指标 满意度 基础设施项目 BT financing model risk sharing evaluation index satisfaction degree infrastructural project
  • 相关文献

参考文献9

  • 1Patriek T, Lam. Aseetoral review of risks assoeiated with major infrastructure Projects [ J ]. International, 2007.
  • 2M‘FouzulKabirKhan,RobertJ.Parra.大项日融资:项目融资技术的运用与实践[M].朱咏等译.北京:清华大学出版社,2005.
  • 3李国彦,吴保平,李冰.BT模式 跟进还是拒绝?[J].建筑,2011(5):6-11. 被引量:3
  • 4Wang S Q, Tiong R L K, Ashley D. Evaluation and Manage- ment of Foreign Exchange and Revenue Risks in China's BOT Projects [ J ]. Construction Management and Economics, 2000, 18(2): 197-207.
  • 5Chee T S, Yeo K T. Risk analysis of a build - operate - trans- fer(BOT) power piant[ J]. Proceedings of 1995 IEEE Annum International Engineering Management Conference, Singapore, 1995 : 275 -280.
  • 6张星,孙建平,李胜.BOT项目风险的模糊综合评价[J].上海经济研究,2004,16(10):69-73. 被引量:17
  • 7Humphreys I, Francis G, Ison S. An examination of risk transference in air transport privatization [ J 1. Transportation Quarterly, 2003, 57(4): 31-37.
  • 8Lam K C, Wang D, Lee P T K, et al. Modeling risk alloca- tion decision in construction contracts [ J ]. International Jour- nal of Project management, 2007 (25) : 485 -493.
  • 9JournalofProjectManagement,1999.

二级参考文献6

  • 1许树柏.实用决策方法—层次分析法原理[M].天津:天津大学出版社,1998..
  • 2Seitz,Helmut & Licht,G , The Impact of Public Infrastructure Capital on Regional Manufacturing Production Cost. Regional Studies, Vol. 29,1995,231-240.
  • 3Nagy, Pancras J , Country Risk:How to Assess,Quantify and Monitor It. Euro money Publication. London. 1979.
  • 4Shou Oing Wang and Tiong. R L K. (1998). Evaluation and Competitive Tendering of BOT Power Plant Proiect in China. Journal of construction engineering and management. Vol. 124,No. 4,July/August.
  • 5Xueqing Zhang. (2004). Concessionaire Selection: Methods and Criteria. Journal of construction engineering and management ,Vol. 130,No. 2 ,April 1,235- 244.
  • 6贾晓霞,杨乃定,姜继娇.项目区域风险的模糊综合评价方法研究[J].工业工程与管理,2004,9(1):4-8. 被引量:16

共引文献18

同被引文献25

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部