摘要
根据含水层下矸石充填采煤覆岩移动变形特征,对等价采高的计算公式进行了细化和修正,并利用此修正的公式对不同充实率的情况下进行预计导水裂隙带高度,实践开采得出结论:含水层下矸石充填对覆岩移动变形产生有效控制,导水裂隙带预计高度和实测结果二者大体一致。
By analyzed the gangue filling mining overburden rock movement and deformation characteristics, the affect of gangue filling percentage under aquifer on development height of water flowing fractured zone was studied. And the calculation formula of equivalent mining height is refined and modified. In the case of different filling rate, the height of the guide is predicted by the modified formula. Mining practice shows that, containing water filled with gangue has effective control on overlying strata movement and deformation, water flowing fractured zone is expected to roughly the same height and measured results.
出处
《安徽建筑大学学报》
2015年第4期33-35,41,共4页
Journal of Anhui Jianzhu University
基金
国家自然科学基金基金(51074002和51274007)联合资助
关键词
矸石充填采煤
充实率
导水裂隙带
等价采高
filling coal gangue
filling percentage
water conducting fractured zone
equivalent miningheight