摘要
对土建工程中高支模的检查、安装、验收、拆除工艺进行了介绍,并研究了土建工程高支模施工中存在的主要问题,提出了加强技术培训、全面准备、按标准规范施工等解决措施,以保证最终的施工质量。
The paper introduces high-support mould examination,installation,acceptance examination and demolishment technology in civil con-struction engineering,studies major high-support mould construction problems in civil construction engineering,and puts forward some solving measure,such as strengthening technical training,comprehensive preparation,standard construction and so on,with a view to guarantee final construction quality.
出处
《山西建筑》
2015年第28期106-107,共2页
Shanxi Architecture
关键词
土建工程
高支模
施工
质量
civil construction engineering
high-support mould
construction
quality