摘要
普宁市旧地电排站是占陇镇主要排涝工程之一,经过30多年的运行,机电设备老化、锈损严重,目前仅有3#泵可勉强运行,且效率低、噪音大、能耗高,存在严重的安全隐患。因此,必须进行技术改造,以满足排涝要求。
Puning Jiudi Pumping Station is one of the main drainage projects in Zhanlong Town. After 30 years of operation, problems like electromechanical equipments aging seriously, rust severity have been emerged, and currently only 3# pump can be barely running, and with low efficiency, high noise, high energy consumption. There are serious security bidden dangers. Technical transformation must be carried out.
出处
《广东水利水电》
2015年第5期60-63,共4页
Guangdong Water Resources and Hydropower
关键词
旧地电排站
机电设备
技术改造
Jiudi pumping station
electrical equipment
technical transformation