期刊文献+

需求降低导致供大于求时供应链生产优化研究 被引量:1

Production Optimization under Oversupply
下载PDF
导出
摘要 针对市场在不可预测情况下,市场需求降低导致产成品供大于求时供应链生产优化的问题,基于供应链的视角,以追求供应链期望总成本最小为目标,创新利用停产率建立生产优化目标规划模型;通过求解分析,得出了供应链停产率决策边界曲线的定义和经济意义,并以此为基础,引入停产成本系数为新的判断指标,来确定生产最优化方案,通过算例对模型进行了仿真验证。 The production optimization problem on supply chain was studied under oversupply market due to falling demand. Based on the perspective of the supply chain, in pursuit of minimizing expected total cost of supply chain as the objective, the production optimization goal-programming model was established by taking advantage of unproductive rate. Through solving and analysis, the definition and the economic signification of supply chain unproductive rate decision boundary curve were given. On this basis of work, the unproductive cost was introduced as the decision criterion to determine the optimal production plan. An ex-ample was given to test, simulate and illustrate the above model.
作者 于锦莹 汪波
出处 《武汉理工大学学报(信息与管理工程版)》 CAS 2015年第4期524-528,共5页 Journal of Wuhan University of Technology:Information & Management Engineering
关键词 生产优化 供应链 供大于求 production optimization supply chain oversupply
  • 相关文献

参考文献11

  • 1焦跃华.论创造企业成本优势[J].中南财经大学学报,2001(4):78-82. 被引量:4
  • 2郭永辉,钱省三.DBR理论中瓶颈资源生产优化研究[J].工业工程,2006,9(6):91-94. 被引量:4
  • 3GUO D F. Rescheduling algorithm for steelmaking -continuous casting[ C]// 2007 Second IEEE Confer-ence Industrial Electronics and Applications. Harbin:IEEE,2007 :1421 -1425.
  • 4WONG H, POTTER A, NAIM M. Evaluation of post-ponement in the soluble coffee supply chain : a casestudy [ J ] . International Journal of Production Econom-ics,2010,131 ( 1 ) :355 -364.
  • 5TANG D. Managing finished - goods inventory undercapacitated delayed differentiation [ J] . Omega,2011,39(5) :481 -492.
  • 6STEVENS G C. Integrating the supply chain [ J]. In-ternational Journal of Physical Distribution and Materi-als Management, 1989,19(8) :3 -8.
  • 7CHENG L C, WEN C L. Multi - objective optimizationof multi - echelon supply chain networks with uncertainproduct demands and prices [ J ]. Computers andChemical Engineering, 2004,28(6) :1131 - 1144.
  • 8XU X D,BIRGE J R. Operational decisions,capitalstructure, and managerial compensation .. a news vendorperspective [ J]. Engineering Economist ,2008 ,53(3 ):173 -196.
  • 9CHEN L,LEE H L. Information sharing and order vari-ability control under a generalized demand model [ J ],Management Science,2009,55(5) :781 -797.
  • 10LEE C H,RHEE B D. Trade credit for supply chaincoordination [ J ]. European Journal of OperationalResearch,2011,214( 1) :136 - 146.

二级参考文献10

  • 1迈克尔·波特.竞争战略[M].华夏出版社,1997..
  • 2弗雷德·R·戴维.战略管理[M].北京:经济科学出版社,1998..
  • 3邢文训 谢金星.现代优化计算方法[M].北京:清华大学出版社,2003..
  • 4Goldratt E M,Cox J.Theory of constraints[M].Massachusetts:North rive press,1990:160-187.
  • 5Gardiner S C,Blackston J H,Gardiner L R.The evolution of the theory of constraints[J].Industrial Management,1994,13(3):13-16.
  • 6Shih Y W,John S M,Thomas M G.A simulation analysis of the effectiveness of Drum-Buffer-Rope scheduling in furniture manufacturing[J].Computers and industrial engineering,1994,26(4):757-764.
  • 7Gardiner S C,Blackston J H,Gardiner L R.Drum buffer rope and buffer management:impact on production management study and practices[J].International journal of operational and production management,1993,13(6):68-78.
  • 8Schragenheim E,Cox J,Ronen B.Process flow industry scheduling and control using theory of constraints.International journal of production research[J],1994,32(8):1867-1877.
  • 9Armentano,Vinicius A,Debora P R.Tabu search total tardiness minimization in flowshop scheduling problems[J].Computers & operations research,1999,26(3):219-235.
  • 10Armentano,Vinicius A,Scrich C R.Tabu search for minimizing total tardiness in a job shop[J].International journal of production economics,2000,63(2):131-140.

共引文献6

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部