期刊文献+

医院净化工程承发包模式的探讨 被引量:1

THE STUDY ON PROJECT DELIVERY MODELS OF PURIFICATION IN HOSPITAL
下载PDF
导出
摘要 文章分析了目前医院净化工程市场存在的问题,认为DBB、DB、EPC三种承发包模式比较适合现有市场环境下的医院净化工程,并归纳了三种承发包模式的特点及适用范围;重点分析了DB承发包模式的优势,特别是在医院净化工程四个重要环节中的运用,并提出了建议。 This article proposes that at present the market of purification engineering in hospital exists the problems of lack of the supervision and management, shortage of the professional designers and supervisors, the spotty constructors. It also demonstrates that the DBB, DB, EPC project delivery models are suitable for the current market environment of purification engineering in hospital, and summarizes the characteristics and application of the three models. It analyzes the application of DB model in four important links of the purification engineering in hospital and presents some advice.
作者 薛亮 陈戎
出处 《中国医院建筑与装备》 2015年第9期70-73,共4页 Chinese Hospital Architecture & Equipment
关键词 医院 净化工程 承发包模式 Hospital Purification engineering in hospital Project delivery models
  • 相关文献

参考文献3

二级参考文献23

  • 1谢伟,李世蓉,兰定筠.浅谈工程项目管理模式与工程承发包模式的区别[J].基建优化,2007,28(3):47-48. 被引量:4
  • 2胡晓军,黄志平.设计施工总承包(DB)与传统承包模式比较研究[J].技术经济与管理研究,2006(2):67-68. 被引量:24
  • 3王素卿.在推动工程总承包与对外工程承包高峰论坛上的讲话,2006.
  • 4权曙光,任远.代建制与其他项目管理模式的比较研究[J].建设管理,2009(9):7-9.
  • 5张朝勇,王卓甫.工程总承包模式的制度经济学思考[J].煤炭工程,2007,39(10):130-132. 被引量:5
  • 6Edwin H. W. Chan, Ann, T. W. Yu. Contract strategy for design management in the design and build system[J]. Project Management, 2005 (23): 630-639.
  • 7Florence Yean Yng Ling. How project managers can better control the performance of design-build projects[J]. Project Management, 2004 (22): 477-488.
  • 8乐云.CM模式与PM模式的比较分析[J].国外监理,1994(5):35-37.
  • 9杨樱梅.EPC工程项目总承包模式造价控制[J].城市建设,2010(22):129-130.
  • 10Jason Owens. Project Cost Control Tools and Techniques [C]. 2007.

共引文献10

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部