4Chris Hendrickson,Tung Au . Project Management for Construction : Fundamental Concepts for Owners, Engineers, Architects and Builders[M]. Prentice Hall, 2000.
5Patricia Tzortzopoulos, Rachel Cooper. Design Management from a Contractor's Perspective: The Need for Clarity [J]. Architectural Engineering and Design Management, 2007, (3) : 17-28.
6Austin S,Baldwin A,Newton A. A data flow model to plan and manage the building design process [J]. Mach. Learn., 1996,7( 1 ) : 3-25.
7Gray C, Hughes W. Building Design Management [M]. Oxford: Butterworth-Heinemann, 2001.
8F Mushtaq,P W H Chung. A systematic Hazop procedure for batch processes, and its application to pipeless plants [J]. Journal of Loss Prevention in the Process Industries, 2000,13( 1 ) :41-49.
3T.C. Pavitt and A.G.F. Gibb: Inter- face Management within Construction: In Particular, Building Facade, Journal of Construction Engineering and Manage- ment, No. 1, 2003.
4U. Nooteboom: Interface Manage- ment Improves On-time, On-budget De- livery of Megaprojects, Journal of Petroleum Technology, No.8, 2004.
5S. Shokri, C.T. Haas, R.C.G.Haas and S.H. Lee: Interface-Management Process for Managing Risks in Complex Capital Projects, Journal of Construction Engineering and Management, 2015: 04015069.