期刊文献+

湖南电网风电接入对调峰影响的量化研究 被引量:5

Quantitative research for peak load regulation effect of Hunan province power grid connected with wind farms
下载PDF
导出
摘要 本文以湖南电网2020年预测负荷、电源为背景,利用电力系统运行模拟软件量化计算并对比分析2种风电与水电联合运行的方法的优劣。供湖南电网乃至水电资源丰富的地区大规模风电接入后的电网调峰能力的研究借鉴。 In this paper,based on the forecasting of load and power in 2020 of Hunan Province,advantages and disadvantages of two kinds of wind and hydro power coordination methods have been calculated and compared by power system simulation software. The analysis result provides reference for study on the peak load regulation ability of Hunan Province Grid and other power grids connected with large-scale wind farms,which locate in rich hydro power resource regions.
出处 《湖南电力》 2014年第2期11-15,共5页 Hunan Electric Power
关键词 湖南电网 风电 调峰能力 风电水电联合运行 Hunan Province Grid wind farms peak load regulation ability wind and hydro power coordination
  • 相关文献

同被引文献32

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部