摘要
本文以湖南电网2020年预测负荷、电源为背景,利用电力系统运行模拟软件量化计算并对比分析2种风电与水电联合运行的方法的优劣。供湖南电网乃至水电资源丰富的地区大规模风电接入后的电网调峰能力的研究借鉴。
In this paper,based on the forecasting of load and power in 2020 of Hunan Province,advantages and disadvantages of two kinds of wind and hydro power coordination methods have been calculated and compared by power system simulation software. The analysis result provides reference for study on the peak load regulation ability of Hunan Province Grid and other power grids connected with large-scale wind farms,which locate in rich hydro power resource regions.
出处
《湖南电力》
2014年第2期11-15,共5页
Hunan Electric Power
关键词
湖南电网
风电
调峰能力
风电水电联合运行
Hunan Province Grid
wind farms
peak load regulation ability