期刊文献+

小湾2号机组压力钢管空鼓形成原因分析及其处理建议

Analysis on Penstock Hollowing Causes of Unit 2 in Xiaowan Hydropower Station and Its Treatment Suggestions
下载PDF
导出
摘要 引水隧洞压力管道是引水发电系统安全监测中的重要环节。通过安全监测自动化系统的离线分析功能,对小湾水电站2号机组压力钢管下平段反馈的监测数据进行分析,建立对压力管道安全性态的初步认识,推断压力钢管空鼓的成因。根据监测数据分析结果,为机组的安全运行和维护提供合理、可靠的决策信息。 The penstock of diversion tunnel system is an important part of diversion-generating system safety monitoring in a hydropower station. Through using the off-line analysis function of automatic safety monitoring system, the monitoring data of lower horizontal section of penstock of Unit 2 in Xiaowan Hydropower Station are analyzed. And then the safety state of penstock is preliminarily understood and the causes of hollowing around penstock are deduced. The analysis results provide reasonable and reliable decision-making information for the safe operation and maintenance of unit.
出处 《水力发电》 北大核心 2015年第10期82-86,共5页 Water Power
关键词 压力管道 空鼓成因 离线分析 安全监测 小湾水电站 penstock hollowing causes off-line analysis safety monitoring Xiaowan Hydropower Station
  • 相关文献

参考文献3

  • 1DL/5178-2003,混凝土坝安全监测技术规范[S].
  • 2赵志勇,张礼兵,肖胜昌,等.枢纽区工程安全监测设计专题报告[R].昆明:中国水电顾问集团昆明勘测设计研究院,2008.
  • 3杨百银,王惠明,侯红英,等.小湾水电站枢纽工程竣工安全鉴定报告[R].北京:中国水电工程顾问集团公司,2013.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部