期刊文献+

山区铁路长大隧道施工组织设计方案的确定 被引量:4

Determination of Organization Design Scheme of Long and Large Railway Tunnel Construction in Mountain Areas
下载PDF
导出
摘要 在工程设计阶段,论证和优化施工组织设计方案,能有效控制工程造价,实现建设项目的预期目标。此文以衢州至宁德铁路鹫峰山长大隧道工程为例,针对所处的地理位置、环保和工期要求,成立专题研究小组,通过现场勘察和分析,研究和论述该隧道施工组织设计方案的确定方法,并对所提出的2种施工组织方案的投资进行对比,以此确定该隧道工程的施工组织设计方案。 In the design phase of the project, it can effectively control the project cost, realize the anticipated target of the construction project by argumentation and optimizing the construction organization design scheme. Taking Quzhou to Ningde railway JiuFengShan long and large tunnel engineering as an example, , the project team is established according to the place of geographical location, environmental protection and construction period, through on - site investigation and analysis, the determination method of the tunnel construction organization design is researched and discussed, and the investment proposed by the two kinds of construction scheme of the tunnel organization plan are compared to determine the construction organization design engineering.
作者 郑岩
出处 《铁路工程造价管理》 2015年第5期17-20,共4页 Railway Engineering Cost Management
关键词 铁路建设 隧道工程 施工组织设计 方案 Railway construction Tunnel engineering Construction organization design Plan
  • 相关文献

参考文献7

二级参考文献14

共引文献33

同被引文献24

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部