浅析锦承铁路长大隧道工程施工组织设计

Analysis of Construction Organization Design in Jincheng Railway Long and Large Tunnel Project
下载PDF
导出
摘要 在铁路工程建设中,长大隧道工程施工是影响和控制整个工程建设工期的关键,其施工组织设计也是直接影响施工进度和工程造价的主要因素。所以,科学合理地做好长大隧道工程的施工组织设计尤为重要。此文以锦承铁路义叶段畸架山隧道工程施工为例,论述如何针对工程实际,做好施工组织设计,来保证工程进度,节省工程投资。 In the construction of railway engineering, long and large tunnel engineering construction is the key to in- fluence and control the whole project construction period, and the construction organization design is also the main factors influencing the construction progress and construction cost directly. Therefore, scientifi- cally completes the tunnel project construction organization design is particularly important. Taking Jincheng railway project tunnel engineering construction as an example, how to complete the construction organization design to ensure the progress and save engineering investment are discussed in view of the engineering practice.
作者 孙悦峰
出处 《铁路工程造价管理》 2015年第5期26-28,共3页 Railway Engineering Cost Management
关键词 铁路工程 长大隧道 施工组织设计 方案 Railway engineering Long and Large tunnel, the construction organization design Plan
  • 相关文献

参考文献4

  • 1铁总建设[2015]79号,铁路工程施工组织设计规范[s].
  • 2娄振光.铁路长大隧道工程施工工期分析与测算[J].铁路工程造价管理,2013,28(6):30-34. 被引量:9
  • 3铁建设函[2008]777号,铁路隧道施工机械配置的指导意见[s].
  • 4铁建设[2008]189号,铁路大型临时工程和过渡工程设计暂行规定[s].

二级参考文献2

  • 1铁建设[2009]226号,铁路工程施工组织设计指南[S].
  • 2铁道第三勘察设计院集团有限公司.集宁至通辽铁路蒙根塔拉至林西段增二线工程补充初步设计文件[Z].天津:铁道第三勘察设计院集团有限公司,2012.

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部