砂混淤泥地基强夯置换墩深度估算 被引量:2

Depth estimation of sand mixed silt foundation dynamic replacement pier
下载PDF
导出
摘要 结合曹妃甸矿石码头二期轨道梁地基加固工程,砂混淤泥地基采用强夯置换法施工,采用土力学理论分析强夯置换墩深度,施工后置换墩采用重型动力触探试验,验证了计算方法的合理性,可为类似工程施工提供参考。 Combined with Caofeidian ore terminal phase II track beam foundation reinforcement engineering, the dynamic replacement method is used for the sand mixed silt foundation construction, we analyzed the dynamic replacement pier depth by using soil mechanic theory. After construction, the replacement pier compactness inspected by heavy dynamic penetration test, we validated the rationality of the calculation method, which can provide a reference for similar engineering construction.
出处 《中国港湾建设》 2015年第9期31-35,共5页 China Harbour Engineering
关键词 砂混淤泥 强夯 置换墩 深度 估算 sand mixed silt dynamic replacement pier depth estimation
  • 相关文献

参考文献5

二级参考文献5

  • 1刘惠珊,饶志华.强夯置换的设计方法与参数[J].地基基础工程,1996,6(2):6-13. 被引量:31
  • 2GB50021-2001.岩土工程勘察规范[S].[S].,2002..
  • 3JGJ79-2012建筑地基处理技术规范[s],2012.
  • 4王福春.唐山港曹妃甸港区矿石码头二期堆场地基强夯处理区地基检测报告[R].天津:天津港湾工程质量检测中心有限公司,2010.
  • 5唐山港曹妃甸港区矿石码头二期堆场地基强夯分区施工图[R].天津:中交第一航务工程勘察设计院有限公司,2009.

共引文献332

同被引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部