介绍了小电流接地选线装置在配置数量、基建验收、运维管理、超期服役等多方面存在问题,分析了造成小电流接地选线装置在电网发生故障时,往往未能充分发挥其应有作用的原因,提出了小电流接地选线装置在入网、工程设计、调试验收、运行维护等方面的治理方案,为提高供电可靠性提供了保证。
Introduction was made to the issues of the small current grounding line selection device in the aspects of allocation quantity, infrastructure construction acceptance check, operation and maintenance management, extended service and so on. This paper analyzed the reasons why the small current grounding line selection device often failed to fully play an important role when the power grid broke down. This paper proposed the treatment scheme of the small current grounding line selection device in access network, engineering design, debug-ging and acceptance, operation and maintenance etc, which guarantees the power distribution reliability.