摘要
通过对总段搭载的反变形进行控制,对主机、齿轮箱基座定位安装中的前期准备工作、定位测量进行控制,最终达到缩短船台施工周期、确保轴线安装精度的目的。
The reverse deformation control of general section carrying is expounded, the prior period preparatory and positioning survey of base sections positioning and installation of main machine and gear box are introduced in this article. The berth period is shortened, the axis installation precision is guaranteed.
关键词
主机、齿轮箱基座
总段搭载
精度控制
The base of main machine and gear box General section carryingPrecision control