深圳地铁11号线车公庙综合交通枢纽工程两相邻基坑开挖对下卧运营隧道的影响 被引量:4

Effect of Foundation Pit Excavation on Existing Underlying Tunnel:Case Study on Chegongmiao Comprehensive Transportation Hub on Line 11 of Shenzhen Metro
下载PDF
导出
摘要 以深圳地铁11号线车公庙站交通枢纽工程为研究背景,分析西端风道基坑开挖和紧邻西端风道的11号线车站基坑开挖对既有深圳地铁1号线隧道的影响,采用三维有限元软件ABAQUS对隧道无保护措施和对土体加固措施2种工况进行计算,分析基坑开挖引起既有隧道的变形规律和旋喷桩的加固效果。同时在隧道内安装自动化监测系统,对隧道变形进行实时监测,通过反馈的监测数据对隧道变形情况进行分析,确保运营隧道的安全。结果表明:旋喷桩加固可以有效地减少隧道隆起的位移。 The impact of the excavation of the foundation pits of the west ventilation tunnel and the station of Chegongmiao comprehensive transportation hub on Line 11 of Shenzhen Metro on the existing tunnel of Line 1 of Shenzhen Metro is an- alyzed in the paper. The rule of the deformation of the existing tunnel induced by the excavation of the foundation pits, as well as the consolidation effect of the jet grouting piles, is analyzed by means of three-dimensional finite element pro- gram ABAQUS. Furthermore, the deformation of the existing tunnel is analyzed on basis of the measured data. It is con- cluded that the jet grouting consolidation can effectively reduce the uplift displacement of the existing tunnel.
出处 《隧道建设》 北大核心 2015年第9期867-872,共6页 Tunnel Construction
基金 中国中铁股份有限公司科技开发计划项目(2012-19)
关键词 深圳地铁 两相邻基坑开挖 西端风道 既有隧道 旋喷桩 监测 三维数值分析 Shenzhen Metro adjacent foundation pits west ventilation tunnel existing tunnel jet grouting pile moni- toring three-dimensional numerical analysis
  • 相关文献

参考文献10

二级参考文献78

共引文献805

同被引文献33

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部