摘要
计算机联锁站的利旧改造通常会引起接口柜的大量改配线。分析了计算机联锁接口柜的施工方法以及导通试验过程,提出有效的解决方案。
The transformation of computer interlocking station through using old equipment may result in a large number of wiring changes in interface cabinet. We focus on the construction method and through test process of computer interlocking interface cabinet and propose effective solutions.
出处
《铁道通信信号》
2015年第9期24-26,共3页
Railway Signalling & Communication
关键词
计算机联锁站
接口柜利旧
施工优化
Computer interlocking statiom Utilization of old interface cabinet
Optimized con-struction