摘要
结合编组站综合自动化系统(SAM)的特点和新丰镇编组站扩能改造工程的实践,对SAM系统信号控制部分工程开通试验的步骤和方法进行了论述,可为类似的工程提供借鉴。
Combined with the features of Synthetic Automation of Marshalling yard system (SAM) and the practice of capacity expansion engineering at Xinfengzhen Marshalling Station, the opening test approach and procedure of parts of signal control of SAM are expounded, which can offer references for the construction of other SAM systems