基于文化融合理论的国际工程项目跨文化风险三维应对模型设计

Three-dimensional response model for crosscultural risk of international engineering projects based on cultural integration theory
下载PDF
导出
摘要 在分析项目与企业文化融合区别的基础上,从人员层级、工作环节以及项目实施阶段3个维度出发,剖析国际工程项目跨文化融合的可能路径,并且基于跨文化融合过程分析构建基于三维文化融合的跨文化风险应对模型。以巴基斯坦高摩赞水利水电工程项目为例,对其工程实践过程中遭遇的跨文化风险进行实证研究,并给出具体的应对措施。 On the basis of analyzing the differences between project integration and enterprise integration,a framework model to deal with the cross-cultural risk of international projects is proposed. From three dimensions of staff level,work area and project team,the possible cross-cultural integration paths of international engineering projects are analyzed,and a three-dimensional cross-cultural risk response model is established. Finally,based on the Comal Zam project in Pakistan, the preceding cross-cultural risk is studied,and some specific response measures are put forward.
机构地区 河海大学商学院
出处 《水利经济》 2015年第5期48-52,76,共6页 Journal of Economics of Water Resources
基金 国家自然科学基金重点项目(70831002) 江苏省自然科学基金(BK20130847)
关键词 国际工程项目 跨文化风险 应对模型 文化融合理论 international engineering project cross-cultural risk response model cultural integration theory
  • 相关文献

参考文献12

二级参考文献68

共引文献81

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部