1Hyun soo Lee, Joon oh Seo, Moonseo Park, et al. Transaction-cost-based selection of appropriate general contractor-subcontractor relationship type [J]. Journal of Construction Engineering and Management, 2009, 135 (11).
4Hu Changming, Wang Xia, Yin Jian. Study on project duration risk based on generalization process index and its application [ A ] //International Conference on Risk and Reliability Management [ C ]. 2008.
5Hyun soo Lee, Joon oh Seo, Moonseo Park, et al. Transaction- cost-based selection of appropriate general contractor- subcontractor relationship type [ J ]. Journal of Construction Engineering and Management, 2009, 135 ( 11 ).