综合性医院污水处理工程改建实例

Reconstruction of Comprehensive Hospital Wastewater Treatment Project
下载PDF
导出
摘要 某综合性医院污水处理站改建工程结合实际情况和《医疗机构水污染物排放标准》的相应要求,强化医院特殊排水分类收集预处理、污水处理站的废气、污泥处理。工程采用"特殊废水预处理+二级强化处理工艺+二氧化氯复合消毒剂消毒处理+循环式紫外线空气消毒"组合处理工艺,医院污水、废气、污泥得到全面控制,各种污染物排放达到了《医疗机构水污染物排放标准》(GB18466—2005)的要求。 The reconstruction project of a comprehensive hospital sewage processing station combines the actual situation with corresponding requirements of Discharge Standard of Water Pollutants for Medical Organization, strengthening hospital special drainage collection processing, and emissions, sludge processing of sewage processing station. Project adopts the combined processing, which integrates the pretreatment of special wastewater, secondary reinforce- ment processing, complex chlorine dioxide disinfectant processing, and circular UV air disinfection. Hospital ' s wastewater, exhaust gas, and sludge are fully under control. At the same time, emissions of various pollutants reach the requirements of Discharge Standard of Water Pollutants for Medical Organization ( GB 18466 - 2005 ).
出处 《漯河职业技术学院学报》 2015年第5期1-4,共4页 Journal of Luohe Vocational Technical College
关键词 医院污水处理 二氧化氯消毒 紫外线空气消毒技术 hospital sewage processing chlorine dioxide disinfection UV air disinfection technology
  • 相关文献

参考文献7

二级参考文献39

共引文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部