摘要
斜井上弯段混凝土施工是洞衬工程中的难点,通过对蒲石河抽水蓄能电站引水斜井上弯段混凝土选用制作承重防护平台后,再进行混凝土浇筑施工的方式可行性,以此为类似工程提供技术参考。
The difficulty construction is concrete lining at upper-lower elbow, the method of construction was fabricated a load-bearing platform for protection the concrete lining in diversion inclined tunnel, this special method can provide the technology for other similar project.
出处
《工程建设与设计》
2015年第10期139-141,144,共4页
Construction & Design for Engineering
关键词
蒲石河抽水蓄能电站
斜井上弯段混凝土
承重防护平台
受力计算
pumped storage power station
upper -elbow concrete lining of diversion inclined tunnel
load-bearing platform for protection concrete lining
construction procedure calculations.