摘要
随着社会经济和施工技术的发展,建筑规模不断扩大,建筑高度不断增加,为了适应超高层建造需要,越来越多的新型建筑机械被应用到工程中。俄罗斯联邦大厦工程在钢结构转换层的施工过程中,根据工程的现场实际情况,在满足钢结构起重量的前提下,利用最小的空间,安装使用了FAVCO 3-beam形式的内爬式塔式起重机,顺利完成了钢结构吊装工作。
With the development of social economy and construction technology,the scales of buildings are expanded and the heights of buildings are increasing continuously. In order to meet the construction requirements of super tall buildings,more and more new construction equipments are widely used in projects. In the construction of conversion floor in Russian Federal Building project,according to the real situation of construction site,under the condition of meeting the capacity of lifting capacity of steel structure,the FAVCO 3-beam internal climbing tower crane was used by taking advantage of the smallest space. The installation of steel structure was finished successfully.
出处
《施工技术》
CAS
北大核心
2015年第17期98-100,共3页
Construction Technology