PPP视角下项目风险因素研究 被引量:4

Research on the Risk Factors of Projects in PPP Model
下载PDF
导出
摘要 PPP项目风险错综复杂,识别关键影响因素为高效风险管理前提。研究构建风险因素指标体系,在模糊层次分析法的群组决策中引入集结主客观赋权的专家权重,结合DEMATEL法分析各风险因素在体系中的综合影响程度。结果表明项目参与方在风险管理中需对政策持续风险、法律变更风险、合同文件冲突风险、融资风险、不可抗力风险着重关注。 The risk of projects in PPP model is complex; and how to identify the key influencing factor is the premise of the effec- tive risk management. This paper sets up the index system of risk factors, imports the expert weight combining objective and subjective synthetic approach in the group decision of fuzzy analytic hierarchy process ( FAHP), and combines the DEMATEL method to analyze the comprehensive influence of risk factors in the system. The results indicate that in the risk management, the project participators need to focus on the continuing risk of polices, the risk of modification of law, the risk of the conflict among the contract documents, the financing risk and the force majeurc risk.
机构地区 山东科技大学
出处 《科技与经济》 2015年第5期11-15,共5页 Science & Technology and Economy
关键词 PPP 模糊层次分析法 群组决策 DEMATEL法 PPP fuzzy analytic hierarchy process group decision DEMATEL method
  • 相关文献

参考文献6

二级参考文献40

  • 1张维然,林慧军,王绥娟.延安东路隧道复线BOT模式之评价[J].中国市政工程,1996(3):48-53. 被引量:2
  • 2Wang S Q. Lessons learnt from the PPP practices in China ( keynote speech) [ A ]. Asian Infrastructure Congress 2006 [ C]. Organized by Terrapinn and sponsored by IAPF, Hong Kong, Nov 29- 30, 2006.
  • 3中华环保频道.长春汇津污水处理有限公司诉长春市人民政府案一审结案[OL].http://www.cctvep.eom/news/news1721.htm,2008-8-20.
  • 4亚洲开发银行.中国城市水业市场化(PPP)推进过程中遇到的一些重要问题及相关建议[R].亚洲开发银行技术援助项目-4095:中华人民共和国/政策调整.2005,1.
  • 5沈际勇 王守清 强茂山.中国BOT/PPP项目的政治风险和主权风险:案例分析.华商?投资与融资,2005,1:1-7.
  • 6浙商网.谁动了杭州湾跨海大桥的奶酪?[OL].http://www.zjol.com.cn/gb/node2/nodel38665/node257861/node257865/node257874/userob-ject15ai3951216.html,2005-3-2.
  • 7中金在线.投资商数亿投资血本无归[OL].http://news.stock888.net/040804/101,1317,1009454,00.shtml,2004-8-4.
  • 8新华网.盲目承诺出恶果:港商索赔9亿元[OL].ht-tp://news.xinhuanet.eom/comments/2004-08/04/content_1708128.htm,2004-8-4.
  • 9赵燕凌.中华发电命系电力改革,竞价上网危及当年BOT承诺[OL].搜狐,转自:财经时报,http://it.sohu.com/34/12/article209271234.shtml,2003-5-15.
  • 10中国水网.中法水务廉江触礁[OL].http://news.h20-china.corn/finance/information/114651029478620-1.shtml,2002-8-16.

共引文献730

同被引文献36

  • 1王雪青,喻刚,邴兴国.PPP项目融资模式风险分担研究[J].软科学,2007,21(6):39-42. 被引量:90
  • 2王守清,刘云.公私合作(PPP)和特许经营等相关概念[J].环境界,2014,25(1):18-25.
  • 3A. Ng et al. Risk allocation in the private provision of public infrastructure[J]. International Journal of Project Management, 2007, 25 (1) : 66-76.
  • 4LI Bing et al. The allocation of risk in PPP/PF1 construction projects in the UK[J] . Engineering Construction and Architectural Management, 2005(12):25-35.
  • 5河永建.中国PPP项目风险公平分担[D].北京:清华大学,2010.
  • 6Gholamreza heravi and Z. Hajihosseini. Risk Allocation in Public-Private Partnership Infrastructure Projects in Developing Countries: Case Study of the Tehran-Chalus Toll Road[J]. Journal of Infrastructure Systems, 2012, 18 (3) : 210-217.
  • 7Wei Zhang. Risk Allocation and Dispute Resolution Mechanism in Chinese Public Projects: An Empirical Study [J]. ICCREM2013, 2014: 637-647.
  • 8Alireza Ghorbani et al. A Survey of Risks in Public Private Partnership Highway Projects in Iran[J]. ICCREM 2014, 2014: 482-492.
  • 9Marques, R. C. and S. Berg. Risks, Contracts, and Private-Sector Participation in Infrastructure[J]. Journal of Construction Engineering and Management, 2011, 137 ( 11 ) : 925-932.
  • 10柯永建,王守清,陈炳泉.基础设施PPP项目的风险分担[J].建筑经济,2008(4):31-35. 被引量:158

引证文献4

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部