期刊文献+

进度计划在EPC总承包项目中的应用探讨 被引量:1

Probe into the Application of Scheduled Plan in EPC(Engineering-Procurement-Construction)General Contract Project
下载PDF
导出
摘要 近年来,随着国际社会生产力的不断提升,EPC总承包管理模式已经逐步成为当今国际项目管理的发展趋势。而实施EPC总承包项目需要系统、科学的管理制度对资源进行合理、全面的配置,制定周密的项目施工计划,并根据项目施工的具体需求及时正确地调整施工计划,并加强设计、采购和施工等各个阶段的进度控制。阐述了EPC总承包项目进度计划的特点,探讨了做好EPC总承包项目进度计划的具体措施。 In recent years, along with the continuous improvement of the international social productivity, the management mode of EPC general contract has gradually become the development trend of today's international project management. And the implementation of EPC general contract project needs a systematic and scientific management system to carry out a reasonable and comprehensive configuration of resources, develop a detailed construction plan, and timely and properly adjust the construction plan according to the specific requirements of the project construction, and strengthen the schedule control of each stages including the design, procurement, and construction, etc. This paper expounds the features of the scheduled plan of EPC general contract project, and probes into the concrete measures for doing well the scheduled plan of EPC general contract project.
出处 《山西科技》 2015年第5期32-33,共2页 Shanxi Science and Technology
关键词 进度计划 EPC 总承包项目 管理模式 EPC scheduled plan EPC general contract project management mode
  • 相关文献

参考文献4

二级参考文献5

共引文献19

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部