摘要
结合工作实践经验,详细介绍了新建太原南站石太场及枢纽相关工程建设期间,工务设备管理单位如何提前介入施工检查、参与静动态验收工作的经验,为今后运营阶段提前打好良好的工务设备基础。
Connecting with the work experiences, this paper introduces in detail the experiences of the public works equipment management unit’s in-advance intervention and participation in static/dynamic acceptance in the construction period of newly built Taiyuan South Railway Station’s Shijiazhuang-Taiyuan Field and hub’s related engineering, in order to lay good foundation for the public works equipment in the future operation stage in advance.
出处
《山西科技》
2015年第5期144-146,共3页
Shanxi Science and Technology
关键词
工务介入
静态验收
动态验收
太原南站
public works’ intervention
static acceptance
dynamic acceptance
Taiyuan South Railway Station