深基坑施工中的支撑置换与提前拆除 被引量:3

Support Replacement and in Advance Demolition in Deep Foundation Pit Construction
下载PDF
导出
摘要 当深基坑围护体系采用"地下连续墙+混凝土支撑+格构柱"的结构形式时,在地下结构施工期间,可根据设计及施工工况提前进行支撑的置换与拆除工作。这种方法的灵活应用,不仅能确保现场按照施工要求进行流水作业,而且能最大限度地减少地下结构的施工工期,大大降低了时间因素带来的安全风险。经对应用工程的测定,安全、工期、成本控制都达到了预期的目标,取得了很好的实施效果。 When the structural forms of "underground diaphragm wall + concrete support + latticed columns" were used for the deep foundation pit support system in construction process of underground structure, the in advance replacement and demolition of excavation supports can be carried out according to design and construction condition. The flexible application of such method not only can ensure the on-site flow process based on the construction requirements, but also can sharply minimize the construction period of underground structure, which can greatly reduce the safety risk caused by time factor. After determination of such application in engineering construction, the safety, the construction period and the cost control have all met the expected goal and achieved good implementation results.
出处 《建筑施工》 2015年第9期1050-1052,共3页 Building Construction
关键词 深基坑 围护体系 支撑置换 提前拆除 斜抛撑 deep foundation pit excavation support system support replacement in advance demolition inclined bracing
  • 相关文献

参考文献8

二级参考文献22

  • 1张金龙,李慧君.关于深基坑围护技术探析[J].中国新技术新产品,2010(23). 被引量:2
  • 2成关锋.深基坑工程中换撑技术的应用[J].建筑技术,2005,36(12):905-906. 被引量:31
  • 3余志成,施文华.基坑支护设计与施工[M].北京:中国建筑工业出版社,1997.
  • 4JGJ120-2012,建筑基坑支护技术规程[S].
  • 5中华人民共和国住房和城乡建设部.JGJ120-2012建筑基坑支护技术规程[S].北京:中国建筑工业出版社,2012.
  • 6刘国彬;王卫东.基坑工程手册[M]北京:中国建筑工业出版社,2009.
  • 7中国建筑科学研究院.JGJ 120-2012,建筑基坑支护技术规程[S]北京:中国建筑工业出版社,2012.
  • 8赵志缙;应惠清.简明深基坑工程设计施工手册[M]北京:中国建筑工业出版社,2000.
  • 9上海现代建筑设计(集团)有限公司.JGJ/T 199-2010,型钢水泥土搅拌墙技术规程[S]北京:中国建筑工业出版社,2010.
  • 10刘国彬;王卫东.基坑工程手册[M]北京:中国建筑工业出版社,2009.

共引文献83

同被引文献23

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部