岩巷掘进中临近水仓最小净岩柱施工技术

Construction Technology of Minimum Net Rock Pillars near Warehouse in Rock Drift Drivage
下载PDF
导出
摘要 陈四楼煤矿在岩巷施工过程中,出现了与水仓(1#、2#)临近的情况,由于临近处净岩柱过小,可能在施工中出现冒顶、片帮、巷帮渗水等现象。采用缩小循环进尺、超前探测、爆破设计优化、竖梁支护等技术,避免了施工巷道冒顶、片帮、巷帮渗水等情况出现,从而提高了掘进速度,并取得了预期的支护效果。 In the process of rock drift construction in Chensilou Coal Mine, the driving face is near the warehouse (1# ,2#) , because the adjacent net rock pillars is small,the phenomenon such as roof caving,rib spalling and water seepage on both sides of roadway would happen in the process of construction. A series of methods were used,including narrow circulating footage, advanced detection, the de- sign optimization of blasting, the vertical beam supporting technologies. The application of these methods has avoided roof caving, rib spalling and water seepage on both sides of roadway, and so on,driving speed is improved,and has obtained the expected result of sup- porting.
作者 王伟峰
出处 《中州煤炭》 2015年第9期54-56,共3页 Zhongzhou Coal
关键词 临近水仓 净岩柱过小 加固支护 near warehouse small net rock pillars reinforced supporting
  • 相关文献

参考文献4

二级参考文献3

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部