摘要
主要介绍了德都地磁台拟迁建新址的勘选过程及结果,勘选过程严格执行GB/T19531.2—2004《地震台站观测环境技术要求》(第二部分电磁观测)及DB/T9—2004《地震台站建设规范》(地磁台站)相关要求,并对勘选的结果做了初步分析。认为五大连池市和平镇翻身村南的台址符合地震及前兆数字观测技术规范的要求。
This paper mainly introduces the process and results of the new sites of Dedu Geomagnetic Station, in strict accordance with the GB/T19531.2 - 2004 Earthquake Observatory Environmental Technical Requirements (the second part electromagnetic observation) and DB/T9 - 2004 Earthquake Station Construction Norms(geomagnetic station) the relevant requirements, and the selection of the results of a preliminary analysis is made. It is showed that the buildings in the south of the Fanshen village conform to the requirements of specification.
出处
《防灾减灾学报》
2015年第3期80-84,共5页
Journal of Disaster Prevention And Reduction
关键词
地磁台站
勘选
初步分析
geomagnetic station
selection
preliminary analysis