摘要
在软土地层中施工的广东佛山南海区多管小间距大断面矩形顶管工程,其施工难度较大,选用六刀盘矩形断面顶管机,并采用"1-3-2-4"跳格顶进方式,顺利完成了目前国内最大断面的矩形顶管工程。
There were many difficulties in the construction of the pipe jacking project in Nanhai District, Foshan, Guangdong, as it was rectangular jacking of multiple pipes with small interval and large section in soft soil strata. With 6-cutterhead rectangular-section jacking machine selected and “1 - 3 - 2 - 4” jump-lattice jacking method used, this project, which has the largest section in the country currently, was completed successfully.
出处
《路基工程》
2015年第5期160-163,共4页
Subgrade Engineering
关键词
大断面
跳格顶进
小间距
large section
jump-lattice jacking
small interval