大伙房水库输水工程TBM洞内拆卸方案设计 被引量:8

Design of removal plan in TBM tunnel of Dahuofang Reservoir Water Conveyance Project
下载PDF
导出
摘要 TBM是一种集掘进、出渣、支护和通风防尘等多功能为一体的隧道施工机械。本文根据TBM在大伙房输水工程中的成功应用,针对洞内TBM拆卸间位置选择、断面设计、TBM主机、连接桥、后配套的拆卸流程进行了阐述,并对TBM在拆卸过程中的注意事项进行了介绍,为类似工程TBM拆卸洞设计、TBM的洞内拆卸提供参考。 TBM is an integrated tunnel construction machine integrating various functions such as tunneling, slag discharge, supporting, ventilation, dust removal, etc. In the paper, TBM removal room position selection in the tunnel, cross section design, TBM host, connection bridge and post supporting removal process are described according to successful application of TBM in Dahuofang Water Conveyance Project, thereby providing reference for TBM removal tunnel design and TBM removal in tunnel of similar projects.
作者 李静
出处 《水利建设与管理》 2015年第9期24-27,共4页 Water Conservancy Construction and Management
关键词 TBM机 拆卸 方案设计 注意事项 TBM machine removal plan design precautions
  • 相关文献

同被引文献44

引证文献8

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部