水利工程中工程变更审核工作的探讨 被引量:2

Discussion on the audit work of engineering change in water conservancy project
下载PDF
导出
摘要 合同变更是水利工程建设中常见的现象,合理地处理变更项目是控制工程总投资的关键环节。本文从政府监管的角度出发,对如何以合同为基准,以事实为依据,在审核过程中公平合理地维护合同双方的利益,有针对性地在变更内容审核方面和变更项目审核方式方法上提出了看法。 Contract change is a common phenomenon in the construction of water conservancy projects, and the proper handle of engineering change is a key link in the process of controlling the total investment of project. From the prospect of government regulation, views are proposed targeted on changing content audit and changing item audit mode, aiming at how to fairly and rationally maintain the interests of both parties in the contract in audit process with contract as benchmark and fact as basis.
出处 《水利建设与管理》 2015年第9期54-56,共3页 Water Conservancy Construction and Management
关键词 变更 合同 审核 水利工程 change contract audit water conservancy project
  • 相关文献

参考文献5

二级参考文献10

共引文献16

同被引文献9

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部