摘要
在交通流量大、重荷载车辆多的情况下,针对双拼段空心板桥及T梁桥的改扩建施工,分别提出了两种施工工艺,以保证交通安全畅通的前提下桥梁拼接施工顺利实施。
In the cases of heavy traffic and enormousvehicleswith heavy load, for the expansion and construction ofHollow Slab Beam and TBridge in semi-detached section, this paper proposed two construction technologies respec-tively to ensure the smooth implementation of the mosaic and bridge construction under safe and smooth traffic.
出处
《河南科技》
2015年第6期69-71,共3页
Henan Science and Technology
关键词
洛三高速
双拼段
桥梁
拼接
确保
畅通
夹具
钢板
Luosan expressway
semi-detached section
bridge
stitching
ensure
smooth
fixture
steel