期刊文献+

渡江战役纪念馆岩土工程勘察实录

GEOTECHNICAL ENGINEERING SURVEY RECORDS FOR THE YANGTZE CROSSING CAMPAIGN MEMORIAL
下载PDF
导出
摘要 合肥渡江战役纪念馆结构独特,位于巢湖之滨,对基础选型及地基持力层选择要求较高,经过钻(静)探、取样测试、原位测试等综合手段勘察,取得了科学准确的参数,对建筑物的地基基础方案设计、岩土设计参数等提出了经济合理的结论和建议,为优化设计、节省投资、安全施工奠定了基础,取得了良好的经济效益及社会效益,同时也积累了在巢湖北部水域岩土工程勘察经验。 Yangtze Crossing Campaign Memorial in Hefei is unique in structure. It is situated at the shore ot the Chao Lake and has higher requirement for its foundation type and the bearing layer. After drilling, sample test, in-situ test and other means of survey, scientific and accurate parameters were obtained. They served as a basis for giving economic and reasonable suggestion on the foundation design, geotechnical design parameter, and also for optimizing design, saving investment and safe construction, and brought good economic and social benefits.
出处 《安徽地质》 2015年第3期217-221,共5页 Geology of Anhui
关键词 渡江战役 纪念馆 岩土工程 勘察 合肥 Yangtze Crossing Campaign Memorial geotechnical engineering survey Hefei
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部