1[1]Tang L X, Liu J Y, Rong A Y, Yang Z H. A review of planning & scheduling systems and methods for integrated steel production. European Journal of Operational Research, 2001, 133(1): 1~18
2[2]Gupta J N D. Two-stage hybrid flowshop scheduling problem. Journal of Operational Research Society, 1988, 34(4):359~364
3[3]Linn R, Zhang W. Hybrid flow shop scheduling: A survey. Computers and Industrial Engineering, 1999, 37(1): 57~61
4[4]Rajendran C, Chaudhuri D. A multi-stage parallel-processor flowshop problem with minimum flowtime. European Journal of Operational Research, 1992, 57(1): 111~122
5[5]Brah S A, Loo L L. Heuristics for scheduling in a flow shop with multiple processors. European Journal of Operational Research, 1999, 113(1): 113~122
6[6]Santos D L, Hunsucker J L, Deal D E. Global lower bounds for flow shops with multiple processors. European Journal of Operational Research, 1995, 80(1): 112~120
7[7]Glass C A, Potts C N. A comparison of local search methods for flow shop scheduling. Annals of Operations Research, 1996, 63: 489~509