因地下室上浮的建筑物倾斜纠倾技术 被引量:7

CORRECTION TECHNIQUE FOR BUILDING INCLINATION CAUSED BY BASEMENT UPFLOATING
下载PDF
导出
摘要 某工程为框架剪力墙结构地下室的刚度较大,由于地下水位上升导致地下室上浮使建筑物倾斜。结合该工程倾斜后的基础底部状况,采取井点降水的方法控制建筑物沉降,采用抽砂机械对基础下的砂土进行清除。同时,在纠倾施工中采用结构竖向位移监测、整体倾斜监测和结构应力应变监测等监控,实现了纠倾施工的信息化监控,确保了结构和施工安全。 In a frame shear wall structure project, the basement has relatively high rigidity and basement upfloating due to underground level increase causes building inclination. Considering the condition of foundation bottom after inclination, well point dewatering method is used to control the settlement of building, the sandy soil at foundation bottom is cleared by sand-suction machine. Various monitoring systems, such as longitudinal structural displacement monitoring, integral inclination monitoring and structure stress monitoring, etc., are adopted during inclination correction construction, to successfully realize information-based control of inclination correction and guarantee structural safety and construction safety.
出处 《建筑技术》 北大核心 2015年第10期904-908,共5页 Architecture Technology
关键词 机械抽砂法 井点降水 沉降 迫降法纠倾 监控系统 mechanical sand suction method well point dewatering settlement forced method for inclination correction monitoring system
  • 相关文献

参考文献4

  • 1CECS225:2007建筑物移位、纠倾、增层改造技术规范[S].
  • 2李今保.计算机应变控制梁柱托换方法.中国.专利号:200710022247.3,2007.
  • 3淳庆,李明丁,李今保,等.某住宅楼的纠倾加固设计与施工[C].第八届全国建筑物鉴定与加固改造学术会议,2006.
  • 4李今保,胡亮亮.某多层综合楼抬升纠倾技术[J].建筑技术,2010,41(9):803-807. 被引量:5

二级参考文献3

  • 1CECS 225:2007,建筑物移位纠倾增层改造技术规范[S].
  • 2GB5007-2002.建筑地基基础设计规范[S].[S].,..
  • 3李今保.计算机应变控制梁柱托换方法.中国.专利号:200710022247.3,2007.

共引文献8

同被引文献32

引证文献7

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部