摘要 介绍了某分布式能源项目的工程概况及设备参数,论述了运行调试中出现的主要问题,分析了问题出现的原因并给出了相应的建议,供同类问题参考。 The engineering situation and the equipment parameters of a distributed energy project were introduced. The main problems occurred in operation and debugging were expounded.The reasons of the problems were analyzed,and relevant suggestions were proposed,which can be used as reference for treating similar problems.
作者 张晶
出处 《华电技术》 CAS 2015年第7期73-75,79,共3页 HUADIAN TECHNOLOGY
关键词 孤岛模式 负荷分析 二级泵系统 平衡管 变频运行 island mode load analysis secondary level pump system balance tube variable frequency operation
  • 相关文献

参考文献4

二级参考文献22

  • 1贺益英.关于火、核电厂循环冷却水的余热利用问题[J].中国水利水电科学研究院学报,2004,2(4):315-320. 被引量:37
  • 2国务院.中国的能源政策(2012)白皮书[R],2012.
  • 3中华人民共和国国家发展和改革委员会.国家发展改革委关于分布式能源系统有关问题的报告(发改能源[2004]1702号)[EB/OL].2013.http://www.sdpc. gov. cn/.
  • 4Distributed energy resources and combined heat and power: a declarationof terms[EB/OL]. 2013. http: //www. aceee, org/research-repgrt/ie001.
  • 5Joerss W. DECENT final report[EB/OL], http.-// www. distributed generation, corn, 2002.
  • 6DOE. Distributed energy resource basics[EB/OL]. 2013. http: // wwwl. eere. energy, gov/femp/ technologies/derchp_derbasics, html.
  • 7Mehleri E D, Sarimveis H, Markatos N C. Optimal design and operation of distributed energy systems.. application to Greek residential sector[J]. Renewable Energy, 2013,51(3) : 331- 342.
  • 8Ren H, Gao W. A MILP model for integrated plan, evaluation of distributed energy systems[J]. Applied Energy, 2010,87 (3) : 1001-1014.
  • 9WADE. What is DE? [EB/OL]. 2013. http: ff www. localpower, org/wadeinaction, html? id = 3929JHJ3929.
  • 10国家能源局.分布式能源[EB/OL].2013.http://www. chinaequip, gov. cn/2012-08/09/c_131772710. htm.

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部