摘要 以华东某面板堆石坝加高工程为例,利用MSC.Marc软件的二次开发功能,结合FORTRAN接口实现非线性弹性邓肯E-B模型.通过面板坝加高前后堆石体及面板应力和变形的分析,对面板堆石坝加高问题进行可行性研究,并用经验公式验证计算的准确性.计算结果表明:坝体加高后堆石体的应力和变形规律较好,面板部分顺坡向拉应力区域转变为压应力,对坝体更为有利,加高方案安全可行. Taking a concrete face rockfill dam(CFRD)heightening project in East China for example,by using MSC.Marc software secondary development function and combining with FORTRAN interface to achieve elastic Duncan E-B model,the feasibility study of heightening the CFRD is carried out through analyzing the stress and deformation of CFRD before and after the dam heightening,and using an empirical formula verify the accuracy of the calculation.Calculation results show that:after heightening dam,the stress and deformation law are better,the face part of the slope of from the tensile stress area transformed into compressive stress area,it is more favorable for the dam;therefore,the heightening scheme is safe and feasible.
出处 《三峡大学学报(自然科学版)》 CAS 2015年第5期9-13,共5页 Journal of China Three Gorges University:Natural Sciences
基金 国家自然科学基金资助项目(51379068 51139001) 水利部土石坝破坏机理与防控技术重点实验室开放基金(YK914022)
关键词 混凝土面板堆石坝 大坝加高 MSC.Marc软件 可行性研究 concrete face rockfill dam heightening of dams MSC.Marc feasibility study
  • 相关文献

参考文献8

二级参考文献24

  • 1蒋国澄,赵增凯.中国混凝土面板堆石坝的近期进展[J].贵州水力发电,2004,18(5):1-4. 被引量:23
  • 2岑威钧,朱岳明,罗平平.面板堆石坝有限元仿真计算及参数敏感性研究[J].水利水电科技进展,2005,25(4):16-18. 被引量:21
  • 3孙陶,高希章,杨建.紫坪铺混凝土面板堆石坝应力-应变分析[J].岩土力学,2006,27(2):247-251. 被引量:16
  • 4沈长松,顾淦臣.面板堆石坝参数反分析及变形规律探讨[J].河海大学学报(自然科学版),1996,24(6):13-19. 被引量:13
  • 5沈珠江.一个计算软土地基固结变形的弹塑性模式.第三届土力学及基础工程学术讨论会论文选集[M].北京:建筑工业出版社,1981.3-81.
  • 6Duncan J M, Chang C Y. Nonlinear analysis of stress and strain in soils [J]. Journal of Soil Mechanics and Foundation Division, ASCE, 1970,96(SM5) : 1629 1654.
  • 7Duncan J M. State of the art: limit equilibrium and finite-element analysis of slopes [J]. Journal of Geotechnical Engineering, 1996,122(7) :577 596.
  • 8Byrne P M, Cheung H, Yan L. Soil parameters for deformation analysis of sand masses [J]. Canadian Geotechnical Journal, 1987,24: 366-376.
  • 9顾淦臣 朱晟.混凝土面板堆石坝三维非线性有限元静力动力分析程序(幅DA)[A]..水利水电工程设计分析计算软件包使用指南[M].北京:科学技术出版社,1991.298-310.
  • 10William L. Bodtman. Design and performance of Shiroro Rock fill Dam [ J ]. CFRDS-Design Construction and Performance Symposium on CFRD [ C]. ASCE Detroit, Oct, 1985:231-251.

共引文献45

同被引文献31

  • 1刘小生,汪小刚,马怀发,侯淑媛.旁压试验反演邓肯-张模型参数方法研究[J].岩土工程学报,2004,26(5):601-606. 被引量:19
  • 2殷宗泽,朱泓,许国华.土与结构材料接触面的变形及其数学模拟[J].岩土工程学报,1994,16(3):14-22. 被引量:392
  • 3徐光明,章为民.离心模型中的粒径效应和边界效应研究[J].岩土工程学报,1996,18(3):80-86. 被引量:144
  • 4刘保军,党进谦.册田水库大坝除险加固措施探讨[J].水利与建筑工程学报,2007,5(3):95-97. 被引量:8
  • 5Higo Y,Lee C W,Kinugawa,et al.Study of dynamic stability of unsaturated embankments with different water contents by centrifugal model tests[J].Soils and Foundations,2015,55(1):112-126.
  • 6Boris Rakitin,Ming Xu.Centrifuge modeling of large-diameter underground pipes subjected to heavy traffic loads[J].Canadian Geotechnical Journal,2014,51(4):353-368.
  • 7Kererat C,Sasanakul I,Soralump S.Centrifuge modeling of LNAPL infiltration in granular soil with containment[J].Journal of Geotechnical and Geoenvironmental Engineering,2013,139(6):892-902.
  • 8Gourvenec S.A centrifuge study on the effect of embedment on the drained response of shallow foundations under combined loading[J].Géotechnique,2011,61(12):1055-1068.
  • 9Kohgo Y,Takahashi A,Suzuki.Centrifuge model tests of a rockfill dam and simulation using consolidation analysis method[J].Soils and Foundations,2010,50(2):227-244.
  • 10Salemi S H,Baziar M H,Merrifield C M.Dynamic centrifuge model tests on asphalt-concrete core dams[J].Géotechnique,2009,59(9):763-771.

引证文献4