摘要
对矿井联系测量中一井定向、两井定向的实现原理进行了分析,从实验模拟、方案选取、外业数据采集、内业数值处理与分析等方面进行了论述,提出了结合既有楼宇楼道、楼梯间实现实验的方法,进行了图示和计算步骤的梳理及要点归纳,达到了书本理论到实验实践的连通,解决了具体实验中的场地局限、数据处理、质量控制的问题。
The paper analyzes realization principles of single shaft orientation and two shaft orientation in coal mine connection measurement,discusses experimental simulation,scheme selection,outdoor data collection,indoor data treatment and analysis and so on,puts forward experimental methods of combining existing building corridor with stairs,collects diagrams calculation procedures and summarizes points,realizes the connection from theory to practice,and solves specific experimental problems including limited field,data treatment and quality control as well.
出处
《山西建筑》
2015年第30期193-195,共3页
Shanxi Architecture
关键词
一井定向
两井定向
实验模拟
数据处理
single shaft orientation
two shaft orientation
experimental simulation
data treatment