期刊文献+

谈一井定向和两井定向的实验模拟及数据处理

Discussion on experimental simulation and data treatment of single shaft orientation and two shaft orientation
下载PDF
导出
摘要 对矿井联系测量中一井定向、两井定向的实现原理进行了分析,从实验模拟、方案选取、外业数据采集、内业数值处理与分析等方面进行了论述,提出了结合既有楼宇楼道、楼梯间实现实验的方法,进行了图示和计算步骤的梳理及要点归纳,达到了书本理论到实验实践的连通,解决了具体实验中的场地局限、数据处理、质量控制的问题。 The paper analyzes realization principles of single shaft orientation and two shaft orientation in coal mine connection measurement,discusses experimental simulation,scheme selection,outdoor data collection,indoor data treatment and analysis and so on,puts forward experimental methods of combining existing building corridor with stairs,collects diagrams calculation procedures and summarizes points,realizes the connection from theory to practice,and solves specific experimental problems including limited field,data treatment and quality control as well.
作者 许多文
机构地区 武威职业学院
出处 《山西建筑》 2015年第30期193-195,共3页 Shanxi Architecture
关键词 一井定向 两井定向 实验模拟 数据处理 single shaft orientation two shaft orientation experimental simulation data treatment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部