摘要
为了保证FPSO坞修期间油田产量,需要考虑临时生产方案,对采用动力定位FPSO进行临时生产的技术方案进行多方面的对比,论证临时生产方案的技术可行性。
FPSO is the key unit of the offshore field. In order to maintian the production during the FPSO dry dock period, a temporary production recover solution is needed. A solution using DP FPSO is designed to recover the production without the original FPSO. The solution is proved to be feasible in technical consideration by comprehensive research in several importance factors.