期刊文献+

有轨电车下穿高铁框构桥安全评估

Safety Evaluation of Modern Tramcar Crossingunder Highspeed Railway Frame Structure Bridge
下载PDF
导出
摘要 沈阳有轨电车1号线一期工程在某处下穿哈大高铁框构桥,将对既有铁路产生一定的影响,可能会引起桥梁结构的沉降、变形。介绍了本工程的安全评估标准及其执行情况,指出有轨电车工程下穿高铁框构桥施工时的注意事项,建议在施工过程中加强第三方监测,重点对哈大高铁桥的沉降和水平变形进行监测。 A project in the 1st phase of Shenyang tramcar line crosses under the framestructure bridge of Ha'erbin- Dalian high-speed railway, which may cause the deforma- tion and settlement of the bridge. The safety assessment criteriaand implementation of this project is introduced. lhe precautions in the case of tramcar crossing under rail- way bridge arc pointed out. Then, a third party survey in lramcar engineering is proposed, especially for the settle- merit of Ha'erbin-Dalian high-speed railway bridge and tile horizontal deformation.
出处 《城市轨道交通研究》 北大核心 2015年第10期32-35,共4页 Urban Mass Transit
关键词 有轨电车 高铁框构桥梁 安全评估 tramcar: high-speed railway framestructurebridge: safety cwtluation
  • 相关文献

参考文献6

  • 1北京城建设计研究总院有限责任公司.沈阳市浑南新区现代有轨电车一期工程初步设计文件[R].北京:北京城建设计研究总院有限责任公司,2013.
  • 2铁道第三勘察设计院集团有限公司.沈阳市航天路下穿哈大客专铁路立交桥工程安全性影响评估报告[R].天津:铁道第三勘察设计院集团有限公司,2013.
  • 3TB 10621-2009 高速铁路设计规范[S]. 2009.
  • 4TB UKX12.3-2005铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].
  • 5沈阳铁路局总技[2012]82号关于做好沈阳市有轨电车工程穿越铁路工作的函[R].沈阳:沈阳铁路局,2012.
  • 6铁道部铁运[2012]83号高速铁路无砟轨道线路维修规则(试行)[S].

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部