位于地裂缝带的接触轨及架空接触网安装方案分析 被引量:4

Analysis of Contact Rail and Overhead Catenary System in Ground Fissure Areas
下载PDF
导出
摘要 地铁工程设计经常存在一些特殊区段,如地裂缝区段,其不均匀沉降将会威胁到接触网系统的装配及相关参数,甚至会造成破坏,进而严重影响地铁的运营安全。结合西安地铁3号线不同地裂缝带的土建结构处理特点,针对接触轨及架空接触网的不同安装特点进行相应的技术方案分析,得出适应不同结构处理方案的接触轨及架空接触网安装方案,满足因地裂缝带结构沉降引起的接触轨及架空接触网调整需求。 Metro project design often comes up against many special sections, such as ground fissures which can damage the installation of OCS and the related parameters, even threaten the operation of metro. According to the suc- cessful civil engineering of Xi'an metro Line 3 on different fissure sections, and based on the analysis of different OCS installation technologies, several methods of OCS installa- tion in the ground fissure areas are proposed, which can meet the needs of adjustment between OCS and contact track in ground fissure areas to and make the OCS more re- liable.
作者 张贤玉
出处 《城市轨道交通研究》 北大核心 2015年第10期129-132,共4页 Urban Mass Transit
关键词 地铁 地裂缝 接触轨 架空接触网 安装方案 metro ground fissure contact rail overheadcatenary system (OCS) installation plan
  • 相关文献

参考文献3

  • 1中铁第一勘察设计院集团有限公司.西安市轨道交通3号线(港务区至鱼化寨段)工程可行性研究报告[R].西安:中铁第一勘察设计院集团有限公司,2010.
  • 2唐晓岚.西安地铁地裂缝带接触网技术研究[J].铁道标准设计,2012,32(8):101-105. 被引量:9
  • 3GB 50157 -2013 地铁设计规范[S].

二级参考文献6

共引文献185

同被引文献25

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部