摘要
介绍了广西长洲水利枢纽工程的基本情况及内江工程施工总布置的条件和原则。论述了对外、场内交通运输方案、场地平整规划、主要施工临时设施布置、土石方平衡及弃渣场布置规划及其特点。
An introduction was made on Changzhou Hydraulic Complex in Guangxi and its general construction ar- rangement of internal river works, including the arrangement conditions and principle. The author also discussed the internal and external communication and transportation, site leveling and planning, arrangement of main tem- porary facilities, earth-rock balance, layout of spoil yards.
出处
《广西水利水电》
2015年第5期26-29,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
长洲水利枢纽
内江工程
施工总布置
Changzhou Hydraulic Complex
internal river works
general construction arrangement