介绍了老挝会兰庞雅水电站厂用电接线形式和运行方式,分析了本工程厂用电的特殊性和复杂性,通过对备自投配置难点和进线备自投接线难点的分析,提出了具体的解决方案及备自投配置的优化方案,解决了复杂厂用电系统的电气二次设计问题。
An introduction was made on the station service power supply system of Houay Lamphan Gnai Hydropow- er Project in Laos, including its wiring and operation mode. The author analyzed the particularity and complexity of the system, such as difficulties of ASAC configuration and wiring, based on which the optimization scheme was put forward, a solution for the secondary electrical design problem of complicated station service power supply system.
出处
《广西水利水电》
2015年第5期49-51,66,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
厂用电
备用电源自动投入
闭锁
会兰庞雅水电站
Station service power supply
auxiliary power supply automatic control (ASAC)
block
Houay Lamphan Gnai Hydropower Project