大吉山钨矿盲主井提升系统设计

Design on hoisting system of underground main shaft in Dajishan Tungsten Mine
原文传递
导出
摘要 通过对大吉山钨矿盲主井提升系统的研究,提出了2个可行的技术方案,在技术与经济上对其进行较详细比较,并分析其优缺点,推荐了高效、节能和工艺流程简洁的技术方案。阐述了本系统工艺设计中应重点考虑的问题,并提出了具体解决措施,可供类似工程借鉴。 The paper studied the hoist system of underground main shaft in Dajishan Tungsten Mine, and proposed two feasible technical schemes. And then, it contrasted the two schemes in technology and economics, analyzed their advantages and disadvantages, and recommended the technical scheme with high efficiency, energy-saving performance and simple process flow. Meanwhile, the paper narrated the issues needed to consider during process design, and offered specific solutions, which was of reference for similar engineering.
作者 曾庆荣
出处 《矿山机械》 2015年第10期50-53,共4页 Mining & Processing Equipment
关键词 提升系统 技术方案 提升参数 工艺设计 运行效果 hoisting system technical scheme hoisting parameter process design operation effects
  • 相关文献

参考文献5

  • 1中国恩菲工程技术有限公司,云南华昆工程技术股份公司、长沙有色冶金设计研究院,等.有色金属矿山节能设计规范[M].北京:中国计划出版社,2011:8.
  • 2长沙有色冶金设计研究院有限公司,中国恩菲工程技术有限公司、昆明有色冶金设计研究院股份公司,等.有色金属采矿没计规范[M].北京:中国计划出版社,2012:102.
  • 3邱水林,郭治平.竖井计量装矿装置电液控制改造[J].矿山机械,2001,29(9):18-20. 被引量:1
  • 4.北京有色冶金设计研究院,长沙黑色冶金矿山设计研究院、沈阳有色冶金设计研究院,等.采矿设计手册[M].矿山机械.北京:中国建筑工业出版社,1988:431.
  • 5北京有色冶金设计研究院,长沙黑色冶金矿山设计研究院、沈阳有色冶金设计研究院,等.采矿设计手册[M].矿山机械,:.

二级参考文献1

  • 1《采矿手册》编委会.采矿手册(第五卷)[M].北京:冶金工业出版社,1991..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部