期刊文献+

Scheduling and Outsourcing with Multiple Customers

下载PDF
导出
摘要 In this paper, we study a new scheduling and outsourcing model with multiple customers in which jobs can be processed by either in-house machine or outsourcing machine.All processed jobs have to be delivered in batches to their respective customers and each shipment incurs a delivery cost as well as a fixed amount of time. We discuss three commonly used objective functions, analyze their complexity and solve them by dynamic programming algorithms. In this paper, we study a new scheduling and outsourcing model with multiple customers in which jobs can be processed by either in-house machine or outsourcing machine.All processed jobs have to be delivered in batches to their respective customers and each shipment incurs a delivery cost as well as a fixed amount of time. We discuss three commonly used objective functions, analyze their complexity and solve them by dynamic programming algorithms.
出处 《Chinese Quarterly Journal of Mathematics》 2015年第3期330-338,共9页 数学季刊(英文版)
基金 Supported by the National Natural Science Foundation of China(71372007) Supported by the Natural Science Foundation of Shandong Province(ZR2011AL017)
  • 相关文献

参考文献8

  • 1CHUNG D, LEE K, SHIN K, et al. A new approach to job shop scheduling problems with due date constraints considering operation subcontracts[J]. International Journal of Production Economics 2005, 98(2): 238-250.
  • 2LEE Y H, JEONG C S, MOON C. Advanced planning and scheduling with outsourcing in manufacturing supply chain[J]. Computers and Industrial Engineering, 2002, 43(1): 351-374.
  • 3CHEN Zhi-long, LI Chung-lun. Scheduling with subcontracting options[J]. IIE Transactions, 2008, 40(12): 1171-1184.
  • 4Qi Xiang-tong. Coordinated logistics scheduling for in-house production and outsourcing[J]. Automation Science and Engineering, IEEE Transactions on, 2008, 5(1): 1884192.
  • 5Xiangtong QI.TWO-STAGE PRODUCTION SCHEDULING WITH AN OPTION OF OUTSOURCING FROM A REMOTE SUPPLIER[J].Journal of Systems Science and Systems Engineering,2009,18(1):1-15. 被引量:15
  • 6LEE K, CHOI B C. Two-stage production scheduling with an outsourcing option[J]. European Journal of Operational Research, 2011, 213(3): 489-497.
  • 7HALL N G, POTTS C N. Supply chain scheduling: Batching and delivery[J]. Operations Research, 2003, 51(4): 566-584.
  • 8LI Chung-lun, VAIRAKTARAKIS G, LEE Chung-yee. Machine scheduling with deliveries to multiple customer locations[J]. European Journal of Operational Research, 2005, 164(1): 39-51.

二级参考文献14

  • 1Chung-Yee Lee,Joseph Y-T. Leung,Gang Yu.Two Machine Scheduling under Disruptions with Transportation Considerations[J].Journal of Scheduling.2006(1)
  • 2Ceyda O?uz,M. Fikret Ercan.A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks[J].Journal of Scheduling.2005(4)
  • 3Nicholas G. Hall,Chris N. Potts.The Coordination of Scheduling and Batch Deliveries[J].Annals of Operations Research.2005(1)
  • 4T.C. Edwin Cheng,Mikhail Y. Kovalyov.Single Supplier Scheduling for Multiple Deliveries[J].Annals of Operations Research (-).2001(1-4)
  • 5Vairaktarakis,G.L.Noncooperative outsourcing games[]..2006
  • 6Vairaktarakis,G.L.Cooperative strategies for manufacturing planning with negotiable third-party capacity[]..2006
  • 7Aydinliyim,T,Vairaktarakis,G.L.Coordination of outsourcing operations[]..2006
  • 8Chen,Z.L,Li,C.L.Scheduling with subcontracting options[].IIE Transactions.2008
  • 9Kyparisis,G.J,Koulamas,C.A note on makespan minimization in two-stage flexible flow shops with uniform machines[].European Journal of Operational Research.2006
  • 10Lee,I.S,Sung,C.S.Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed[].European Journal of Operational Research.2008

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部