隧道小空间基坑分层先核心土开挖施工方法

Excavation and Construction Method of Core Soil Excavation in the Foundation Pit of Tunnel
下载PDF
导出
摘要 土方工程是基坑工程中重要的一项内容,安全、快速、经济的土方开挖施工方法不仅可以保证基坑的质量和安全,还是减少施工总工期和成本的一个重要手段。论文结合实体工程成功实践,详细阐述了基坑分层先核心土开挖施工方法,该工法施工安全,进度快,经济效益明显,解决了施工净空较小的基坑工程土方开挖问题。 Earthworks is a part of foundation pit engineering. Safe, fast and economical excavation construction method can not only ensure the quality and safety of foundation pit, but also reduce the total construction time, and it is one important means of cost. In the light of the successful practice of the project entity, excavation layered first core soil excavation construction method is detailed, and the method is the construction safety, progress fast, economic benefits obvious; it solve the construction clearance smaller excavation earthwork excavation
作者 李国华
出处 《工程建设与设计》 2015年第11期107-108,111,共3页 Construction & Design for Engineering
关键词 隧道 小空间基坑 分层先核心土开挖 施工 tunnel small space foundation pit the first core soil excavation construction
  • 相关文献

参考文献2

二级参考文献11

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部