摘要
提出了一种面向对象法的水力计算方法,既能够提高准确度又便于针对管网结构变动情况下的水力计算。新方法考虑了摩擦阻力系数和温度沿管长分布的影响。计算结果表明,面向对象法的水力计算方法相比于传统的水力计算方法,准确度更高。
A new object-oriented hydraulic calculation method is developed to improve the accuracy, which can be used where the pipeline structure is changed, and the distribution and change of the friction coefficient and temperature along the pipe is considered as well. The result proves that the new method has a more precise calculation considered to the old one.
出处
《上海煤气》
2015年第5期5-8,11,共5页
Shanghai Gas
关键词
管网
水力计算
面向对象
pipeline
hydraulic calculation
object-oriented